Lenzing back in production after fire

Lenzing, Austria. Austria's Lenzing Papier is back in full production after the serious 5 November fire which saw the company endure 46 days of downtime.

0

The company said 90,000 metres (295,275 ft) of cabling had to be replaced and all electrical wiring was lost. During the downtime caused by the fire – most likely caused by a short circuit igniting paper machine cables – Lenzing said it modernised its paper machine and carried out maintenance.